Responding to a מכרז
IGV supports a company or an investor through the process: reading the specifications, תנאי סף, required documents, organisation of the response, timeline, document coordination and follow-up through to submission.
Professional tourism
IGV Land sheet — free access. The information below is factual and dated; an IGV assumption is always presented as such.
IGV Land analyses exclusively the commercial, economic and professional operating components of this project. Any residential component of the wider programme falls outside the scope of IGV Land.
Park HaYain is a programme developed in Zikhron Yaakov around the region's wine identity. IGV Land studies exclusively its economic and professional components: tourism, hospitality, commerce, wine-related activities, professional operations. The Israel Land Authority and Ministry of Tourism had notably planned two groups representing approximately 265 tourist accommodation units. After several stages, procedure 353/2024 closed without a recorded winner for either site under review. IGV Land follows Park HaYain not as a currently open procedure but as a relaunch case whose history makes it possible to analyse the conditions required for a viable future professional operation. Any residential component of the wider Park HaYain programme falls outside the scope of IGV Land.
Procedure 8/2023 — published 08/02/2023, closed 27/05/2024. It covered the same two sites, totalling 265 tourist accommodation units. • Site 10.1 + 10.2 (115 units, 15,397 m²): a result was recorded, at ILS 5,313,536. Minimum price ILS 5,313,518, development expenditure ILS 12,695,250. • Site 13.1 (150 units, 13,371 m²): no bids. Minimum price ILS 4,565,824, development expenditure ILS 11,024,376. Procedure 353/2024 — published 10/10/2024, tender booklet published 30/12/2024, opened 13/01/2025, closed 24/03/2025. • BOTH sites were put back to procedure. • No bids were recorded for either of them. Minimum prices and development expenditure for 353/2024: see the site table.
Park HaYain raises a different question from Harish South. The attractiveness of the area and its tourism identity do not, by themselves, guarantee that a professional project can achieve economic balance. Its history shows that the following factors must be assessed together: development expenditure, operating format, tourism market absorption, number of units, complementary activities, costs and overall project structure. For IGV Land, the central issue is therefore to understand why the formats previously offered did not lead to a sustainable outcome and to identify the economic, operational and strategic conditions that could make a future professional operation better aligned with actual demand. Park HaYain is therefore presented as a project to be understood and repositioned, not as a promise of availability or outcome.
• Procedure 353/2024 is CLOSED. It is not open for bids. Any new opportunity would require a fresh publication by the competent bodies. • Neither site received ANY bid in that procedure — official data, not an interpretation. • Development expenditure exceeds twice the minimum price on both sites. • The number of accommodation units came from ILA and Ministry of Tourism publications; any change would require the necessary approvals. • Figures quoted for 8/2023 and 353/2024 relate to their respective procedures and cannot be carried over to any future procedure.
Amounts in shekels, as published by the public body. No conversion is applied.
| Site | Plots | Area | Minimum price | Valuation | Guarantee | Development expenditure |
|---|---|---|---|---|---|---|
| א (10.1 + 10.2) | ש/656 / 10.1 · 10.2 | 15 397 m² | 5 743 554 ₪ | 12 623 196 ₪ | 1 320 000 ₪ | 13 213 373 ₪ |
| ב (13.1) | ש/656 / 13.1 | 13 371 m² | 4 987 793 ₪ | 10 962 184 ₪ | 1 147 000 ₪ | 11 474 704 ₪ |
For investors, companies and operators who want to study the opportunity concretely.
One-off purchase for this project. No subscription. Buying the dossier does not include any advisory assignment.
IGV supports a company or an investor through the process: reading the specifications, תנאי סף, required documents, organisation of the response, timeline, document coordination and follow-up through to submission.
Project development, on-site analysis, commercial positioning and tenant mix, sourcing of brands, operators and occupiers, negotiation, coordination and support through to actual roll-out.
IGV is not a law firm, an accounting firm or a licensed real estate agency. Where an action falls under a regulated profession, IGV coordinates with the licensed professional.
IGV can support the study of the operation, the tender response, commercial development and the implementation of the project in Israel.
Engagement quoted individually according to the nature and complexity of the project.